Coating Rehabilitation

When inspection reveals that pipeline corrosion systems begin to break down buried in the ground, various forms of rehabilitation coatings are available. The affected pipe is either exposed via a bell hole or raised
in entire sections. The surface, including the defective original coating,
is cleaned and a new coating is applied.

Rehabilitation coatings for over the ditch application include:

  • Cold Tape
  • Liquid Coatings

For more detail see External Coating Rehabilitation and Internal Coating Rehabilitation

rehabilitation of damaged coating
using cold applied tape